| 1 | Supplier Profile 01 | Guangdong, South China | 3-axis to 5-axis milling; complex aluminum and steel components | Aluminum, stainless steel, carbon steel, brass, engineering plastics | 1–10,000 pieces | Typical general tolerance: ±0.05 mm; tighter tolerances subject to drawing review | ISO 9001 quality management system reported | 5–10 working days | 15–30 working days | Strong Export packaging and documentation support | Request current certificate, inspection report, material certificate, and sample approval |
| 2 | Supplier Profile 02 | Jiangsu, East China | High-volume 3-axis and 4-axis machining for repeat components | Aluminum alloys, stainless steel, mild steel, copper alloys, POM | 50–50,000 pieces | Typical general tolerance: ±0.05–0.10 mm depending on geometry | ISO 9001 quality management system reported | 7–12 working days | 20–40 working days | Strong Experienced with commercial export orders | Confirm production capacity, monthly output, process-control plan, and inspection frequency |
| 3 | Supplier Profile 03 | Zhejiang, East China | Precision 3-axis and 5-axis milling for small and medium-sized parts | Aluminum, titanium, stainless steel, tool steel, nylon | 1–2,000 pieces | Typical general tolerance: ±0.03–0.05 mm; critical features require CMM inspection | ISO 9001 reported; incoming and final inspection available | 6–12 working days | 18–35 working days | Strong Suitable for engineering and industrial buyers | Check CMM capability, calibration records, surface-finish control, and first-article procedure |
| 4 | Supplier Profile 04 | Shandong, North China | Large-format 3-axis milling for machine frames and industrial parts | Carbon steel, stainless steel, cast aluminum, cast iron | 1–500 pieces | Typical general tolerance: ±0.10 mm; precision areas quoted separately | Quality system varies by facility; written quality plan required | 10–18 working days | 25–50 working days | Conditional Export capability depends on project size | Confirm machine travel, maximum workpiece weight, welding capability, and rust-prevention method |
| 5 | Supplier Profile 05 | Fujian, Southeast China | 3-axis milling and CNC turning-milling for hardware and mechanical parts | Aluminum, brass, stainless steel, low-carbon steel, ABS | 20–20,000 pieces | Typical general tolerance: ±0.05–0.10 mm | ISO 9001 reported; supplier quality records should be reviewed | 5–10 working days | 15–35 working days | Good Suitable for standard export shipments | Verify tool-life management, batch traceability, packaging standards, and defect-handling process |
| 6 | Supplier Profile 06 | Hubei, Central China | 4-axis and 5-axis milling for automotive and industrial assemblies | Aluminum, alloy steel, stainless steel, titanium, high-temperature alloys | 5–5,000 pieces | Typical general tolerance: ±0.03–0.05 mm; capability depends on material and feature size | ISO 9001 reported; sector-specific compliance must be confirmed | 8–15 working days | 20–45 working days | Good Technical communication required for complex parts | Request capability study, material traceability documents, FAI report, and equipment list |
| 7 | Supplier Profile 07 | Anhui, East-Central China | 3-axis milling for prototypes, jigs, fixtures, and low-volume production | Aluminum, stainless steel, steel, brass, PEEK, Delrin | 1–500 pieces | Typical general tolerance: ±0.05 mm; tighter tolerance available after feasibility review | Quality system may be customer-specific; inspection plan recommended | 4–8 working days | 12–25 working days | Good Responsive for prototype projects | Approve a prototype before production and define acceptance criteria in the purchase order |
| 8 | Supplier Profile 08 | Chongqing, Southwest China | 5-axis milling for complex aerospace-style and energy-sector geometries | Aluminum, titanium, stainless steel, nickel-based alloys, composites | 1–1,000 pieces | Typical general tolerance: ±0.03–0.05 mm; GD&T and inspection requirements required | ISO 9001 reported; additional certifications must be verified by project | 10–18 working days | 25–50 working days | Conditional Best suited to technically controlled projects | Audit programming controls, calibration system, operator qualifications, and material certification process |
| 9 | Supplier Profile 09 | Henan, Central China | 3-axis and 4-axis milling for tooling, molds, and industrial replacement parts | Tool steel, pre-hardened steel, aluminum, copper, engineering plastics | 1–2,000 pieces | Typical general tolerance: ±0.05–0.10 mm; mold and tooling tolerances quoted separately | Quality management practices vary; supplier audit recommended | 8–15 working days | 20–40 working days | Moderate Confirm international logistics experience | Review tool-steel certificates, hardness reports, trial-run records, and corrective-action procedure |
| 10 | Supplier Profile 10 | Liaoning, Northeast China | Heavy-duty 3-axis and 4-axis milling for energy and industrial equipment | Carbon steel, stainless steel, ductile iron, aluminum, bronze | 1–300 pieces | Typical general tolerance: ±0.10 mm; precision features require separate technical agreement | ISO 9001 status should be confirmed before ordering | 12–20 working days | 30–60 working days | Moderate Suitable for large and heavy components | Confirm lifting capacity, machine envelope, dimensional inspection method, and shipping responsibility |